Project Details
- 2.661 MWp
- SMA Sunny Central 2200
- 8064 panels
- 330 watt Seraphim 72 cell poly panels
- 1000 volt system
- 20 x 288 panel arrays
- 16 x 144 panel arrays
- Compact site area of 120 m x 201 m
- Total Site utilisation of 67% ground coverage
Scope
Solar Mounting Systems took a supply and site support scope for this project which included 30 on site man days giving assistance. This ensured that the system was supplied on time and cost and efficency targets were achieved while speeding up the learning process.
Durability
The regular annual inspection after finish of construction has shown that the system is still the same as the day of completion with no visable changes or corrosion to any parts. No additonal maintainence has been required
Delivery
Solar Mounting Systems delivered this system in 3 stages of about 900 KWp per stage. This allowed for a controlled build time without excess material on site.